Scaling up buys capacity with a bigger machine and keeps the system simple, until the largest machine is reached. Scaling out buys capacity with more machines and has no fixed ceiling, at the price of more parts to run. The part being scaled, the shape of the load and the size of the team decide which comes first.

Scaling up and scaling out on four axes
AxisScaling upScaling out
CeilingThe largest machine on offerNone fixed; add another copy
FailureStill one machine; it fails as a wholeOne copy fails, the rest carry on
ComplexityNo code change, nothing new to operateState must move out; more machines to run
Cost curveEach step about doubles the priceGrows in small steps, one copy at a time
Scaling up

Use it when

  • The part holds state that is hard to split, such as a database taking writes
  • A larger machine exists and the team is small
  • The load is growing steadily, not leaping

Avoid it when

  • The largest machine is already in use, or close to it
  • One machine failing would take the system down and no standby exists
Scaling out

Use it when

  • The part is stateless, such as application servers
  • Load swings widely through the day, so copies can come and go
  • Losing one machine must not be noticed

Avoid it when

  • State still lives in each server's memory
  • Splitting the part needs work the team cannot yet carry, as sharding a database does

A worked choice. A single relational database is at 80% CPU from writes, and the team has two engineers. A bigger machine is the next step: one setting, no new parts. Read copies would not help, because the load is writes, and sharding, splitting the data across databases, is a project the team cannot yet carry.

So scale stateless parts out and stateful parts up first, and move a stateful part out only when the largest machine, or the need for a spare, forces it.